25 Years of Recording Studio Construction

Joules Newell and the Newell Acoustic Engineering team have up to 25 years of professional recording studio construction experience behind them

 

Since 1985 we have been delivering Philip Newell designed recording studios and acoustic spaces

From home studios to major construction developments the team are able to deliver a finished product to the highest standards.

Fully conversant with European building standards, site protocol, and dealing with other trades, the team can ensure a smooth delivery of any recording studio project no matter what size.

As well as commercial music studios we are highly experienced in the design, construction and delivery of Dolby Digital film dubbing theatres, including Dolby Premier standard.

The Newell Acoustic Engineering in house CAD design team and planning department are able to draw up all the necessary specifications and documentation required to ensure that projects run smoothly. We can supply assistance through the planning and permissions stage and provide the expertise required when the projects fall under the umbrella of specialist contracting. We can ensure that project management runs smoothly and where necessary negotiate with contractors and authorities when the specialist needs of critical acoustic control falls outside the realms of standard building practices.

Newell Acoustic Engineering also have a specialist electrical and electronic department to ensure that the technical systems are as well catered for as the acoustics, after all, what good would perfect acoustics be without perfect technical systems.

Newell Acoustic Engineering teams are all safety trained, and experienced in safe installation practices, where required we have UK CSCS card holding staff.

Back